Sixteen wicking beds are being constructed for the Honours wicking bed project. They are constructed in four IBC containers cut in half and then fitted with a divider across the middle of the half container. This allows two different materials to be trialled for the drainage layer in each half IBC. The dividers have to be waterproof. The green material is bathroom waterproofing paint left over from our bathroom. It was painted onto fabric and corflute panels and allowed to dry. It turned out that there was some leakage so pond liner was installed in the bottom of each wicking bed. A range of materials are being used inside the pond liner so their effectiveness can be measured and compared.
2 Comments
Deslee Hancock
21/11/2019 10:03:40 am
Hi following your research with interest as I am wanting to transfereto wicking beds. I live on the South Coast.
Reply
Mat
12/1/2020 12:07:53 pm
Other than one study by UniSA it has been very difficult to find research of wicking beds. I’m really looking forward to hearing more
Reply
Your comment will be posted after it is approved.
Leave a Reply. |
Blog writer
Chris is exploring how wicking beds work for a Charles Sturt University honours project. This blog reports on the findings of this original research. Archives
July 2022
Categories |